Joint Committee on Information Technology 11/19/2026
Introduction to Cybersecurity Incident Presentation
Overview of the Meeting
- The committee meeting begins with a note that draft minutes will be approved before lunch.
- Alex Wong, Judicial Branch Chief Information Technology Officer, introduces the presentation focused on lessons learned from cybersecurity incidents in 2022.
- Emphasis is placed on keeping the slides non-technical and suitable for public consumption.
- Wong mentions colleagues present to provide firsthand perspectives on the incident while he discusses improvements made since then.
Incident Details
- The presentation will cover what happened during the incident, its impact, response strategies, recovery processes, and top lessons learned.
Incident Timeline and Initial Response
Discovery of Malicious Activity
- Anne Madden-Johnson describes how reports of VPN access issues began around 7 a.m. on October 12, 2023.
- By 9 a.m., confirmation of malicious activity led to shutting off external network access to contain the threat.
Communication and Coordination
- Notifications were sent to executive branch security offices and law enforcement by 1 p.m., involving Jeff Maxson for guidance during recovery efforts.
Understanding the Scope of the Incident
Recovery Challenges
- Initially optimistic about quick recovery, it became clear that restoring systems would take much longer than anticipated due to the incident's severity.
Rethinking Cybersecurity Strategy
- Acknowledgment that recovery involved more than IT systems; there was a need for a comprehensive reevaluation of cybersecurity strategies.
Impact on Court Operations
Daily Operations Disruption
- Carrie McGinley highlights profound impacts on court operations due to lack of necessary resources without functioning case management systems.
Manual Processes Reinstated
- Courts had to revert to manual processes such as using paper receipts and locating old supplies like file stamps from storage.
Public Access Issues
Challenges Faced by Court Staff
- Many staff members required training for manual processes they were unfamiliar with due to reliance on electronic systems prior.
Inability to Assist Public Effectively
- Courts struggled with assisting individuals needing information about traffic tickets or upcoming hearings due to system outages.
Filing Procedures During Outage
Transitioning Back to Paper Filings
- Without e-filing systems, courts had no choice but to accept paper filings which created organizational challenges amidst increased paperwork volume.
Incident Response Strategies
Coordinated Efforts Required
- Multiple critical issues arose simultaneously requiring collaboration between court staff and outside experts while rebuilding core IT systems with enhanced security measures.
Administrative Orders Issued
Guidance During Uncertainty
- An administrative order issued addressed electronic filing unavailability and provided formal guidance for court procedures during system downtime.
Importance of Collaborative Support in Court Operations
Building Partnerships for Operational Continuity
- Close collaboration with local court IT teams, county IT teams, OITS, and the judicial branch team was essential to maintain court operations during challenges.
- Addressed issues like counties disconnecting courts from their networks to protect systems, which inadvertently affected phone systems in district courts.
- Assisted courts in deploying additional scanners without network requirements; finding analog fax machines became a challenging task.
Recovery Planning Beyond Technology
- Emphasized that recovery planning must encompass not just technology but also involve people and justice partners crucial for operational continuity.
- Help desk operations team inspected and processed around 300 devices before reconnection, coordinating with remote staff for equipment safety.
Enhancements in Security Measures Post-Incident
Strengthening Cybersecurity Protocols
- Implemented tighter password requirements and expanded multi-factor authentication across the state to enhance security measures.
- Redesigned network structure through segmentation to limit potential movement of attackers within compromised areas.
Monitoring and Education Initiatives
- Enhanced monitoring and alerting capabilities improved identification of suspicious activities; expanded employee education programs on threat recognition.
- Acknowledged that initial protective measures were reactive due to urgency but laid groundwork for long-term strategic planning.
Strategic Leadership Changes in Judicial Branch
Introduction of Dedicated Security Roles
- The judicial branch appointed a dedicated Chief Information Security Officer (CISO), followed by hiring a new Chief Information Technology Officer (CITO).
Implementation of Governance Tools
- Introduced a Governance Risk and Compliance (GRC) tool based on the CIS 8.1 framework to organize security controls effectively.
Long-Term Security Control Processes
Privileged Access Management
- Established processes for privileged access management requiring multiple approvals and justifications before granting elevated access rights.
Legislative Support for Standardization
- SB 291 evolved into House Bill 2574, aiding standardization of security requirements within the judicial branch including .gov domain migrations.
Migration Efforts Towards Enhanced Security
Transitioning Digital Infrastructure
- Migrated email services from kscord.org to .gov domains alongside transitioning Zoom platforms to enhance security protocols.
Comprehensive Endpoint Management
- Implemented enterprise-level tools such as patch management, mobile device management, and endpoint detection post-security incident awareness.
Evaluating Service Hosting Locations
Data Center Migration Decisions
- Conducted assessments leading to the decision that hosting services on Azure would provide better security and scalability compared to previous setups.
Restoration Efforts Following Incident
Reopening Access Points
- Restoring access was critical; initially limited access points required opening help centers staffed by clerks from various locations.
Public Assistance Initiatives
- Help centers managed document requests, warrant processing, driver's license reinstatements while ensuring public health center accessibility through scheduled sign-ups.
Addressing Personal Information Exposure
- Notified approximately 150,000 individuals about potential exposure of personal information; offered credit monitoring services at no cost.
Document Management Challenges
- Significant efforts were needed to backload paper documents into the system accurately associating them with respective cases while updating court actions accordingly.
Overview of Cybersecurity Incident Recovery
Timeline and Milestones
- The timeline outlines major milestones during the recovery process following a cybersecurity incident.
- Recovery efforts from the incident to the implementation of an e-filing system took less than one year, aided by support from various branches of government and vendors like Tyler Technologies and Tibera.
Lessons Learned
- Anne presents ten lessons learned from the recovery process, emphasizing significant insights gained during this challenging period.
Leadership and Planning
- Judges must take a leadership role; their involvement is crucial for setting priorities and guiding staff through changes in court procedures.
- Establishing a Continuity of Operations Plan (COOP) is essential for maintaining court functions during system outages.
Cybersecurity Preparedness
- Organizations should prepare for cyber attacks as inevitable events rather than rare occurrences, focusing on minimizing impacts when incidents occur.
- Security considerations should be integrated into all planning stages, including software purchases and process changes.
Shared Responsibility
- Cybersecurity is a collective responsibility; while IT provides protections, daily decisions by all staff contribute to safeguarding operations.
Ongoing Commitment to Cybersecurity
- Cybersecurity requires continuous effort; tools must be regularly updated, monitored, and staff trained to adapt to new threats.
- A comprehensive review of systems is necessary to identify dependencies and risks associated with both major applications and smaller programs.
Communication Strategies
- Effective communication plans are vital; organizations should establish protocols for updates even if primary communication channels fail.
Collaboration with External Partners
- Engaging vendors, experts, and government partners early can enhance preparedness before incidents occur.
Support During Recovery
- The collaboration between executive/legislative branches and eCorp vendors was critical in restoring systems post-cyber incident.
Managing Workload
- Sharing workloads among team members helps prevent burnout; recognizing contributions fosters morale during prolonged recovery efforts.
Questions from Senator Bowser
Discussion on Incident Impact
- Senator Bowser highlights the costly nature of the incident beyond financial implications, stressing its impact on public trust in the Kansas court system.
Improvements Post-Incident
- Acknowledgment of improvements made since the incident includes strengthening identity access management and updating policies related to cybersecurity practices.
Follow-Up Questions
Tabletop Exercises & Vulnerability Scans
- Inquiry about conducting tabletop exercises reveals that while there is a plan in place, execution has been limited since prior leadership.
White Hat Testing
- Current vulnerability scans are conducted by multiple vendors but no formal white hat hacking exercises have taken place yet.
Sharing Knowledge Across Courts
Dissemination of Information
- Confirmation that presentations regarding cybersecurity improvements have been shared with other state courts through various platforms like NCSE.
Use of AI in Cybersecurity
AI Tools Utilization
- Discussion around using AI tools indicates ongoing evaluation due to potential vulnerabilities they may introduce alongside their benefits.
- Current utilization involves leveraging Microsoft Azure's built-in tools for enhanced security measures within their data center operations.
Understanding the Relationship Between State and County IT Resources
Structure of Reporting
- The relationship between state and county is highlighted, emphasizing that representatives and senators understand this dynamic as counties report through county commissioners.
IT Resource Responsibilities
- Counties are mandated by statute to provide IT resources to courthouses, leading to standards and requirements often set by county IT divisions.
Enforcement Challenges
- There are challenges in enforcing these standards on the countryside, indicating a need for collaboration to ensure understanding of requirements while allowing access to necessary resources.
Strategies for Enhancing Network Security
VPN Implementation
- A strategy being implemented is the mandatory use of VPN connections for all counties, ensuring health checks and security checks before devices can access the network.
Virtual Desktop Environment
- Another approach involves creating a virtual desktop environment that provides endpoints without installing applications directly on user devices.
Standardization and Control Measures
Terminal Display Systems
- Users will interact with terminal-like systems displaying applications through a virtual environment, enhancing standardization and control over device requirements.
Discussion on Contingency Operations Plans (COOP)
Presentation Feedback
- Positive feedback is given regarding the presentation quality, highlighting its significance in addressing lessons learned from past incidents.
Update Frequency Concerns
- Questions arise about how often COOP plans will be updated; it’s noted that fax machines may remain as backup methods due to their perceived security in medical contexts.
Infrastructure Considerations in COOP Planning
Centralized vs. County Plans
- The COOP plan focuses on infrastructure needed for service availability; there are duplicate plans at both central judicial branch levels and county levels due to shared systems like case management software.
Communication Efforts in COOP Development
Annual Review Process
- Efforts are made to communicate with counties regarding their participation in COOP planning; updates occur at least annually or more frequently when system changes happen.
Accountability Issues Raised
Historical Vulnerabilities
- Concerns are raised about previous warnings during legislative audits regarding vulnerabilities within the judiciary's systems that were not addressed adequately at the time.
Public Impact Considerations
Effects on Individuals
- Acknowledgment of how public members were affected during incidents emphasizes the need for comprehensive efforts beyond just those within the judiciary system.
Standardization Across Counties
Individual County Plans
- Each county has its own contingency operation plan but efforts are made towards uniformity across jurisdictions due to interdependencies between systems used by different counties.
Importance of Consensus in Judicial Communication
Need for Unified Decision-Making
- Emphasis is placed on establishing clear communication channels among judicial branches to avoid discrepancies that could lead back into disarray similar to "the Wild West."
Transitioning Case Management Systems
Johnson County Migration Status
- Clarification provided regarding Johnson County's separate status during earlier incidents; they have since migrated fully into the statewide case management system as of November 2024.
Legislative Update by Chief Information Technology Officer
Hardware Refresh Updates
- Alta Fuddin, the Chief Information Technology Officer, provides updates on hardware refresh transitioning from a leasing model to an ownership model for legislative devices.
- Deployment of new devices is ongoing, with plans to have them ready before the session starts despite challenges with legislators not returning.
- The hardware refresh project is expected to be completed by mid-December, slightly behind the original end-of-November target.
- Communication has begun with legislators regarding returning laptops for preparation for incoming members.
Website Improvements
- An external vendor is engaged to enhance website navigation and ADA compliance, aiming for rollout before the session begins.
K-List Project Status
- The K-List project has been accelerated since June, allowing more testing opportunities and involvement from staff members.
- Testing efforts are crucial in identifying issues early; significant time has been dedicated by advisors and staff over three months.
- A presentation was made to LCC on November 6th discussing benefits and risks of transitioning from the old system to K-List.
Approval and Future Work
- LCC approved going live with K-List; it will have necessary functionalities for the upcoming session while further developments continue until May.
Support During Session
- Vendor support will be available during sessions to address any potential issues that arise with the new system.
Committee Assistance Hardware Updates
Equipment Readiness
- John Langer discusses readiness of equipment for committee assistants but notes delays due to staffing logistics.
Staffing Challenges
- The current stage involves waiting for personnel availability; equipment is ready but coordination remains a challenge due to simultaneous arrivals of staff.
Security Measures Impacting Setup
- New security protocols require additional setup time which affects timely access for all staff members as they transition towards a zero-trust environment.
Clarifications on Computer Refresh Process
Understanding Equipment Refresh Needs
- Gene Hoffman clarifies that only computers being returned are refreshed; new computers are primarily allocated for incoming legislators.
Lifecycle Management of Devices
- Computers purchased in 2425 are refurbished rather than replaced entirely; this process aims at sustainability within budget constraints.
Planning Challenges
- Unexpected demands can deplete supplies quickly when multiple requests occur simultaneously, complicating planning efforts.
This structured summary captures key discussions and insights from the transcript while adhering strictly to timestamp rules.
Discussion on Legislative Process and System Changes
Concerns Over System Upgrades
- A committee member expresses discomfort with the major change involving Kalis, indicating a preference for maintaining existing systems.
- The decision to upgrade was made outside the committee, leading to significant bottlenecks in the legislative process during sessions.
Bandwidth Testing and Information Tracking
- Questions arise regarding bandwidth testing and timing issues, highlighting concerns about the revisers being locked down due to Kalis's influence.
- Inquiry into whether the CAN Focus site will continue to be utilized or phased out.
Current Status of CANFocus
- Confirmation that no decision has been made yet to replace CANFocus; it remains available for current users.
- Uncertainty expressed about when decisions regarding system changes will be finalized.
Introduction of Chris Crook from CAMERON
Overview of CAMERON
- Chris Crook introduces himself as the executive director of CAMERON, representing Kansas Research and Education Network (KanREN).
- KanREN is one of 40 research and education networks in the U.S., operating at state level as a standalone nonprofit since its founding in 1992.
Services Provided by KanREN
- KanREN provides connectivity through a fiber backbone, security services, discounted software, and technical expertise for educational institutions.
- Comparison made between regular internet (public highway) and research networks (dedicated express lanes), emphasizing less congestion and enhanced security for large data transfers.
Importance of In-State Connectivity
Data Transfer Insights
- Half of all data transferred by KanREN occurs within Kansas, showcasing significant inter-institutional exchange capabilities.
- KanREN facilitates disaster recovery and backup capabilities for institutions during crises.
Recognition and Infrastructure Development
- In 2014, KanREN was recognized as Kansas's primary Research and Education Network.
- Visual representation shared showing existing infrastructure with plans for expansion through projects like Free State Middle Mile.
Future Expansion Plans
Aspirational Goals
- Plans discussed to expand network presence into Denver alongside existing connections in Kansas City, Tulsa, and Dallas.
Membership Base
- Members include K–12 schools, libraries, municipalities, community anchor institutions, Board of Regents institutions, independent colleges/universities.
Core Functions Beyond Connectivity
Security Services Offered
- Emphasis on providing secure connectivity along with vulnerability scanning services at no cost to members.
Consulting Services
Consulting provided to various educational entities such as K–12 schools; collaboration noted with organizations like KUMC.
Operational Independence
Non-Profit Structure
- Highlighted that KanREN operates independently without direct state appropriations; members govern operations setting their rates.
Middle Mile Project Collaboration
Partnerships Established
- Discussion on partnerships formed with local companies like Idea Tech for middle mile project aimed at enhancing connectivity across underserved areas.
Community Impact
- The initiative aims not only to serve institutional needs but also foster competition among local ISPs while reducing costs through open access opportunities.
Recent Grant Achievements
Broadband Accelerator Grant Success
- Announcement of successful application for broadband accelerator grant which will enhance network capacity in Wichita benefiting both WSU and rural Sedgwick County communities.
Funding and Connectivity Initiatives in Kansas
Overview of Funding Contributions
- The organization facilitates funding to offset costs for its members, generating approximately $3 million annually to support K-12 institutions and healthcare providers.
- Specifically, over half a million dollars is returned to K-12 schools, while healthcare educators receive about $2.3 million each year.
- This funding model has been consistent year over year, significantly aiding connectivity budgets for many schools.
Challenges with State Contracts
- The organization has been operating under the same state contract since 2003, which is set to expire next year.
- Navigating the expiration poses challenges as it directly impacts their ability to apply for the annual $3 million funding.
- Despite these challenges, they have maintained communication with the Office of Procurement and are actively seeking solutions.
Importance of Technology Initiatives
- The speaker emphasizes the need for recognition of their organization amidst various technology initiatives in Kansas, such as Connected Nation and AI integration.
- They highlight their expertise and involvement with key state offices like KDOT and Broadband Development but stress that they often lack visibility in discussions.
Q&A Session Insights
- During the Q&A session, questions arise regarding new IXPs in Wichita and their potential impact on connectivity across Kansas.
- Investments in technology are viewed positively as they enhance competition and lower costs for consumers in Wichita.
Fiber Network Developments
- Discussion includes existing fiber connections from Wichita to Pratt; new middle-mile programs aim to expand this network further into underserved areas.
- A partnership with IdeaTech aims to provide dark fiber connections essential for research at Wichita State University while ensuring competitive internet access for residents.
Ownership and Security Concerns
- Clarification on ownership reveals that CanRen does not own any fiber but partners with private companies like IdeaTech for infrastructure development.
- The security of networks is ensured through multi-strand conduits where data privacy is maintained similar to traditional telephony systems.
Discussion on Fiber Infrastructure and Competition
Overview of Fiber Development
- The speaker expresses concerns about competing with private industry for residential fiber services, emphasizing that such competition is not included in their bylaws.
- They mention the ongoing construction of fiber infrastructure, indicating that access will be available to some users.
Insights on Kanren Usage
- Acknowledgment of Kanren's role in K-12 school districts; however, there are questions regarding its limited adoption.
- The primary reason for low adoption appears to be cost-related issues associated with using Kanren services.
Service Offerings and Support
- The speaker highlights the higher costs associated with K-12 institutions joining Kanren due to their focus on providing access primarily to backbone members.
- Consulting services are provided to institutions lacking technical staff, showcasing the organization's commitment to supporting educational entities.
Technical Expertise and Response Time
- The organization employs a small team of highly skilled technicians who can quickly address connectivity issues for member institutions.
- Members appreciate the immediate and detailed responses they receive when contacting technical staff, which includes data analysis and troubleshooting support.
Membership Structure and Pricing Model
Membership Tiers Explained
- There are multiple tiers of membership available; basic membership costs $600 annually, granting access to newsletters and events.
- Aggregated members pay for connections integrated into the network along with additional administrative fees based on service usage.
Backbone Costs Distribution
- The board comprises representatives from various sectors (K-BOR schools, K-12 seats, healthcare), determining how backbone costs are allocated among members based on size metrics like IPEDS numbers.
Interaction with KDOT Regarding Fiber Access
Legislative Developments
- Mention of a house bill aimed at allowing broader access to fiber conduits installed by KDOT along transportation corridors.
Future Opportunities
- Anticipation that this initiative will enable companies to install their own fiber within these conduits, fostering increased competition in Kansas' internet service market.
Understanding Cost-Benefit Dynamics
Nonprofit Model Justification
- Clarification that Kanren operates as a nonprofit entity providing internet access primarily for public organizations while maintaining lower operational costs compared to traditional ISPs.
Competitive Advantages
- By leveraging existing infrastructure and partnerships, Kanren can offer significant savings compared to what would be required if institutions sought similar services independently.
Overview of IT Operations and Challenges
Introduction to IT Presentation
- The meeting begins with a brief acknowledgment of the pathways across the state, indicating a collaborative atmosphere.
- Jeff Maxson, Chief Information Technology Officer, agrees to present the three-year IT plan ahead of time but notes challenges in coordinating quarterly reports with agencies.
Current Landscape of Cybersecurity and AI
- Maxson addresses concerns regarding AI's impact on cybersecurity, clarifying that recent disruptions were due to upgrades rather than cyber attacks.
- An assessment revealed thousands of patches released by four major IT providers within two months, averaging 72 patches daily.
Rapid Changes in IT Operations
- The speed at which AI identifies vulnerabilities and creates patches is significant; however, some AI-generated patches may not function correctly.
- This rapid evolution necessitates changes in IT operations globally, emphasizing the importance of adapting strategies accordingly.
Three-Year IT Plan Update
Participation and Reporting
- OITS is mandated to publish a three-year IT plan involving participation from all three branches of government.
- Approximately 69 agencies contributed submissions this year, reflecting strong representation across various sectors.
Key Findings from Agency Submissions
- A total of 503 activities were identified among agencies, with about 75 success stories highlighting accomplishments over the past year.
- Around 60% of submissions focused on modernizing IT infrastructure through equipment and application upgrades.
Strategic Focus Areas for Improvement
Project Timelines and Initiatives
- Half of submitted projects are expected to conclude by the end of the calendar year (2027), indicating potential progress in agency workstreams.
- Short-term initiatives (30%) are anticipated to take less than a year for completion, focusing on operational upgrades like server operating systems.
Guiding Principles for Future Planning
- Updates to strategic frameworks aim at achieving operational excellence by aligning service delivery with agency missions while reducing complexity.
Goals for Cybersecurity and Technological Transformation
Establishing Cybersecurity Culture
- A core goal includes fostering a data-driven culture that enhances decision-making through improved data governance principles.
Embracing Emerging Technologies
- The introduction of AI requires strategic technology transformation efforts aimed at adopting new technologies while phasing out outdated systems.
Harmonizing Architecture Across Agencies
Reducing Duplication in Tools
- Efforts focus on minimizing tool duplication across agencies while recognizing unique needs; this aims to streamline processes and improve efficiency.
Capital Complex Wi-Fi Modernization and Connectivity Enhancements
Overview of Wi-Fi Upgrades
- The capital complex underwent a modernization upgrade for Wi-Fi, aiming to enhance connectivity across the area.
- Agencies will no longer incur additional costs for Wi-Fi as it is being integrated into general connectivity services.
Transition to Fiber and Contract Harmonization
- A significant shift from Ethernet to fiber connections is being implemented statewide to improve overall connectivity.
- OITS has modernized its Cisco contract framework, consolidating various contracts into one enterprise agreement for cost savings.
Security Enhancements Across Executive Branch
Enterprise Firewall Rollout
- The rollout of enterprise firewalls is ongoing across the executive branch, managed by the Kansas Information Security Office.
- This initiative enhances visibility and response capabilities through centralized security management.
Integration of Various Departments
- KDADS and DCF environments are being updated with new security devices; additionally, the Department of Corrections' parole offices have been integrated into this environment.
Cloud Architecture Transition
Migration to Cloud Solutions
- Core systems are transitioning to cloud architectures, creating efficiencies and enhanced security not available in traditional on-premises setups.
- The Sharp and Smart system has migrated to AWS, utilizing cloud components for improved file transmission between agencies.
System Upgrades
- The UI system has successfully transitioned from a mainframe setup to a modern AWS-based system with increased availability.
- There’s also a migration from VMware to Nutanix solutions within state operations.
Digital Workflow Expansion Initiatives
Public Access Improvements
- Efforts are underway to create a digital front door for citizens, enhancing public access through an enterprise licensing platform that standardizes multiple professional licenses.
Workflow Automation Strategies
- Automated workflows are being developed within agencies to increase efficiency in service delivery.
- Agencies are working towards compliance with accessibility guidelines (WAG), improving public portal accessibility standards.
Strategic IT Planning Evolution
Reinstating IT Planning Framework
- After nearly a decade without a three-year IT plan, efforts began in 2022 to standardize this planning process moving forward.
Aligning IT Strategy with Business Needs
- Future IT strategies will be aligned more closely with business needs rather than solely focusing on technology itself.
Investment Planning Challenges
Addressing Budget Coordination Issues
- Historically poor investment planning in IT systems leads to challenges when multiple agencies request large budgets simultaneously during legislative sessions.
Future Investment Strategies
- A focus on better fiscal planning is essential as IT costs rise; coordination among agencies regarding investment timing is crucial.
Agency Visioning Process
Engaging Cabinet Secretaries
- Meetings were held with cabinet secretaries asking them about their ideal agency operations in three years without focusing on IT specifics.
Identifying Common Goals
- Feedback collected helped identify commonalities among agencies which can inform potential enterprise investments or shared solutions.
Operationalizing Strategic Insights
Translating Vision into Actionable Steps
- Plans include producing both strategic documents outlining agency visions and operational roadmaps detailing actionable steps at both agency and statewide levels.
Strategic Planning and Agency Collaboration
Overview of Changes in Strategic Approach
- The agency is maturing its efforts to advance strategic planning, focusing on a clear vision rather than just tactical activities over three years.
- Plans are underway to expand the new strategic approach from cabinet agencies to non-cabinet agencies in the coming year.
- This exercise is valuable for understanding customer needs, enhancing service delivery within OITS.
Engagement with Agency Secretaries
- Appreciation was expressed for agency secretaries who dedicated time for discussions, which facilitated better collaboration.
- The outcomes of these meetings will provide useful documentation for incoming governors and their teams.
Legislative Feedback on Strategic Planning
Positive Reception from Legislators
- Senator Tyson commended the forward-thinking approach and acknowledged past inefficiencies in three-year plans.
- Senator Bowser raised concerns about resource prioritization amidst competing demands, seeking insights into decision-making processes.
Prioritization Challenges
- Discussion highlighted the difficulty of balancing risk-based priorities against agency leadership's preferences.
- Emphasis was placed on reducing risks while acknowledging that ultimate prioritization lies with agency heads.
Standardizing IT Governance
Methodology Development
- Efforts are being made to standardize IT governance methodologies across agencies to ensure consistent decision-making processes.
- A mechanism is being developed to escalate priority disputes to the governor’s office when necessary.
Framework and Future Planning
Strategic Framework Insights
- Legislators appreciated the strategic framework and "North Star" concept as guiding principles for future planning.
Agency Response Rates
Engagement Statistics
- Approximately 69 agencies responded, with only five not participating; these were likely smaller agencies according to preliminary checks.
Introduction of Department Revenue Presentation
Overview of Department Functions
- The presentation introduces key divisions within the Department of Revenue, highlighting major projects and applications used by each division.
Taxation Division Insights
Taxation System Overview
- The taxation division operates a unified tax system established over 26 years ago, known as ATP (Astra Tax Program).
Key Applications in Use
- ACM serves as a collections management application closely related to ATP, sharing infrastructure and background.
Modern Developments
- KCSE is an internally developed application facilitating business registration and electronic filing through modern interfaces.
Vehicles Division Operations
Direct Constituent Services
- The Vehicles Division utilizes several applications including "Movers," which manages motor vehicle registration across all counties since its launch around 2012.
Innovations in Service Delivery
- "I Can Pay It" system allows constituents to perform complex transactions online or via mobile platforms, significantly reducing office traffic.
Alcoholic Beverage Control Application
Cloud-Based Solutions
- Alcoholic Beverage Control uses Posse, a vendor-owned cloud application that integrates licensing, enforcement, reporting, payments, and fines into one platform.
Overview of the Orion Application
Transition to Cloud Infrastructure
- The Orion application, initially vendor-provided off-the-shelf software, has been in use since the era of AS/400 systems and was originally hosted at county offices.
- The agency collaborated with the vendor to migrate Orion into Azure cloud infrastructure, although they have not yet adopted the latest version offered by the vendor.
Legal Division's Implementation
- The legal division transitioned from paper-based management to using iManage, a product from a sister agency that significantly improved their case workload management.
- This integration allows for electronic interactions across divisions and is expected to remain in use for an extended period.
Agency's IT Strategy and Self-Service Platforms
Data Ownership and Infrastructure Consolidation
- Divisions own both data and applications; however, the IT department aims to consolidate infrastructures for efficiency.
- The agency seeks to transition traditional transactions onto self-service platforms across all divisions while ensuring safety and security.
Cloud-first Approach
- Emphasizing a cloud-first strategy, the agency prioritizes cloud options unless specific needs dictate otherwise.
- While some applications may not be suitable for cloud deployment due to vendor limitations or other factors, cloud solutions are generally preferred for their manageability.
Importance of Data Security
Compliance Challenges
- Enterprise data security is critical as the agency handles sensitive information such as tax records and personal health data.
- Being compliance-driven necessitates extensive work on security measures due to IRS data holdings.
Recent Projects Overview
Successful Implementations
- Recent projects include successful implementations like iManage in 2024 which received positive feedback from users.
- The ABC Posse project involved migrating an application into a vendor-managed cloud solution that also garnered satisfaction among users.
Upcoming Initiatives
- A new driver's license issuance system is set to launch in August or September next year after decades with previous providers.
Legacy Systems Management
Ongoing Challenges with Mainframe Systems
- Two remaining tax systems still operate on mainframes; efforts are underway to unify these under a single tax system framework.
Continuous Infrastructure Refreshes
- As a full-service IT organization, continuous updates of operating systems and infrastructure components are essential for maintaining modernity and security.
Future Opportunities with AI Integration
Exploring AI Applications
- AI technologies are increasingly integrated into products marketed by vendors; partnerships aim at incorporating overarching AI activities within state operations.
Specific Use Cases
- Current contracts include AI tools that enhance training material production speed and efficiency.
- An AI add-on for direct-to-consumer chat functions is being evaluated, aiming to streamline communication while adhering to state policies.
Enhancements in Development Processes
Developer Tools Improvement
- Developers gain access to co-pilot features bundled with Visual Studio that expedite tasks like code migration from COBOL applications.
Compliance Considerations
- Maintaining compliance standards involves significant collaboration between various regulatory bodies impacting application design and network security protocols.
Overview of Car Title Research and Data Management
Historical Data Availability
- The agency has approximately 300 documents related to car titles from the 1950s, allowing for extensive historical research.
- Unlike private entities that retain limited data, the agency maintains hundreds of millions of records in its content management systems.
Challenges with Legacy Systems
- Major changes to core systems like title and registration or tax systems require years of planning and execution, often costing millions.
- These large-scale projects are rare due to their complexity and cost, leading to applications that may outlive industry standards.
Discussion on Legacy Tax System
Need for Replacement
- The legacy tax system is over 26 years old; replacing it would be expensive and time-consuming.
- Questions arise about whether to continue with the current system or plan for a replacement given its age and inefficiencies.
Internal Ownership and Planning
- There is no clear plan for replacing the outdated tax system; internal appetite for change is currently fractured.
- A new tax system must be carefully planned, studied, and laid out before any commitment can be made.
Options for New Tax Systems
Off-the-Shelf Solutions
- Ideally, an off-the-shelf solution would exist for immediate purchase; however, such options are limited in the tax system space.
- There are a few vendors available that could potentially meet the agency's needs but none have been identified as ideal yet.
Legislative Concerns Regarding Tax Credits
Reporting Issues
- The department struggles to provide reports on tax credits because they are managed via individual spreadsheets rather than a centralized database.
Importance of Accurate Tracking
- There was a proposal in 2023 aimed at integrating these credits into the main tax system but it was rejected by decision-makers.
Financial Implications of Tax Credit Management
Untracked Funds
- Billions of dollars in potential revenue from untracked tax credits raises concerns about accountability within the agency.
Need for Transparency
- Legislators emphasize the need for simple reporting mechanisms to understand which credit programs are effective or not.
Inquiry About Previous Investments
Past System Purchases
- Questions were raised regarding an expensive forecasting system purchased years ago that reportedly hasn't been utilized effectively since its acquisition.
Current Usage Status
- Clarification provided that a taxation forecasting product called SAS is indeed in use today by the Policy and Research Division.
Economic Impact and Tax System Modernization
Discussion on Economic Growth
- The speaker emphasizes that stimulating the economy has not led to negative consequences, countering opposition claims about potential state financial breakdown.
- Current revenue levels are reported as positive, indicating successful economic management despite concerns.
Vehicle Modernization Efforts
- Inquiry into involvement with vehicle modernization efforts, specifically regarding updates to the car tag system.
- The speaker mentions limited involvement in discussions but acknowledges having one staff member who is somewhat informed about the project.
Importance of Expert Involvement
- Suggestion made that involving knowledgeable individuals in modernization discussions could be beneficial for project outcomes.
- Recognition of ongoing projects utilizing commercial off-the-shelf solutions indicates a trend towards modernizing systems effectively.
KTRIPS Coordination
- Mention of KTRIPS coordinating with KDOT for road construction and rerouting large vehicles highlights inter-agency collaboration.
- Acknowledgment that vendor-managed spaces require accurate routing information from KDOT during permit processes.
Tax System Considerations
Overview of State Tax Systems
- Discussion on the longevity and necessity of updating outdated tax programs within the state’s framework.
- Comparison made between states with rapid growth lacking taxes versus those maintaining their own tax systems.
Off-the-Shelf Solutions for Tax Management
- Proposal to utilize existing robust off-the-shelf tax systems to enhance efficiency without starting from scratch.
- Confirmation that several vendors have experience across multiple states, offering modern cloud-managed tax solutions.
Integrated Tax Management Approach
- Emphasis on Kansas having an integrated tax system managing 25 different types of taxes under one umbrella.
- Suggestion to transition individual tax types gradually towards new providers rather than overhauling all at once, minimizing risk.
Project Implementation Concerns
Strategy for Transitioning Tax Systems
- Concern raised about piecemeal implementation leading to disjointed products; advocates for prioritizing major tax types first before integrating smaller ones.
Need for Timely Discussions
- Urgency expressed regarding initiating conversations about these transitions now rather than delaying until later stages.
Meeting Proceedings
Approval Process and Next Steps
- Acknowledgment of committee members' early arrival and preparation for lunch break before continuing discussions post-lunch.
Minutes Review
- Reminder given regarding minutes available in packets; plans set to reconvene after lunch at 1 PM for further presentations.
IT Monitoring Project Overview
Introduction to IT Monitoring Activities
- Presentation begins with a memo overview sent to the post-audit committee concerning ongoing IT monitoring projects.
Purpose of Monitoring Projects
- Clarification that monitoring aims to identify risks related to scope, schedule, or cost issues early in project development.
DCF Rehabilitation Services IT Project History
- Background provided on DCF's Rehabilitation Services Division's use of legacy systems since 1989 costing nearly $1 million annually due to inefficiencies.
New Contract Details
- Announcement of a new contract signed in November 2024 for a cloud-based software solution expected by mid-July 2027 at an estimated total cost of $4.6 million.
Initial Monitoring Results
- First quarter results indicate unsatisfactory scope understanding between DCF and vendor; adjustments needed from both parties moving forward.
Project Status Update as of August 1st
Financial Overview
- As of August 1st, the project had incurred costs totaling nearly $1.4 million, which was deemed unsatisfactory.
- The Cost Performance Index (CPI) was calculated at 2.08, indicating that the project is under budget; a CPI above 1 signifies being under budget.
- The state has paid over $880,000 to the vendor, representing about one-third of the total projected cost.
- DCF accepted and paid for 19 out of 33 deliverables during this monitoring period, with additional payments nearing $490,000 for contracted staff and quarterly monitoring fees.
Schedule Assessment
- The project's schedule is rated satisfactory; however, design and development are progressing slower than anticipated.
- The original go-live date remains July 2027; adjustments have been made to completion percentages without altering major milestones.
- By the end of the monitoring period, only 77% of design and development tasks were completed against a target completion by February 2026.
- Stakeholders expressed general positivity regarding the schedule but raised concerns about payment processing dependencies on the state's financial system.
Security Evaluation
- As of August 1st, security measures were rated satisfactory; comprehensive security requirements were included in the signed contract.
- Both security plan deliverables have been accepted and paid for by the state; ongoing monitoring is emphasized by staff involvement.
- A security review is planned closer to the go-live date to ensure compliance with established protocols.
Presentation Transition
Introduction by Jeff Maxson
- Jeff Maxson introduces himself as Chief Information Technology Officer for Executive Branch amidst technical difficulties with his laptop.
Quarterly Report Overview
- The fiscal year '27 first quarter report covers projects from July through September 2026, detailing a total of 30 active projects.
Active Project Status: DCF Child Support Services Replatforming Project
- This project has been flagged as alert status due to various challenges encountered since its inception approximately four years ago.
Challenges Faced in Project Execution
- The Child Support System (CSS), initially aimed at migrating software from mainframe to .NET environment, faced unexpected delays due to federal data de-identification requirements introduced after project initiation.
- Complications arose when a subcontractor was acquired by IBM during critical phases of work leading to further delays in progress.
Current State and Future Considerations
- New security policies necessitate revisiting previously unconsidered areas within the project scope causing additional delays but ensuring adherence to updated standards.
Discussion on Project Budget and Status
Confusion Over Budget Figures
- A participant expresses confusion regarding the budget status of a project, specifically questioning the meaning of a red alert indicating $3.7 million over budget.
- The speaker clarifies that the actual cost is $12.7 million against a planned cost of $15.4 million, raising questions about whether they are over or under budget.
- There is uncertainty about the figures presented, with suggestions that numbers may have been misrepresented or misunderstood.
Clarification on Reporting Practices
- Sarah Spinks from the KESO office explains that when projects are recast, future reports reflect the recast budget rather than initial estimates.
- The remaining estimate to complete the project is confirmed to be $3.7 million based on previous assessments.
Project Testing and Security Concerns
- A participant notes that completion of system integration testing suggests nearing project completion but raises concerns about security assessments causing delays.
- Questions arise as to why security was not involved earlier in the project lifecycle, highlighting evolving state policies requiring stricter compliance.
Importance of Early Security Involvement
- Another participant emphasizes the need for early engagement with security teams to avoid last-minute complications during project execution.
Remaining Budget and Future Projections
- President Haskins seeks clarity on remaining funds after recasting, questioning if they will exceed original budgets by significant amounts.
- It’s clarified that while $12 million has been spent so far, an additional $3.7 million is needed to complete the project, resulting in an overall increase beyond initial plans.
Addressing New Security Requirements
Impact of New Security Policies
- Discussion shifts towards new security requirements impacting project timelines; there’s uncertainty about how long these adjustments will take.
Evaluation of Project Viability
- The speaker indicates ongoing evaluations regarding whether continuing with current strategies remains viable given changing costs and requirements since inception six years ago.
Cost-Benefit Analysis Reevaluation
- Participants discuss how rising costs for tools and services challenge initial assumptions about moving away from mainframe solutions for cost savings.
Insights from IBM's Involvement
- The role of IBM in reassessing technical needs highlights potential gaps in skills previously held by subcontractors affecting project outcomes.
Final Thoughts on Project Direction
- Acknowledgment that continued learning throughout a project's life cycle may lead to reevaluating its viability based on current insights and conditions.
Evaluation of Security Aspects and Project Delays
Overview of Current Status
- The focus is currently on evaluating security aspects, with a goal to complete this assessment before the year's end. Stakeholders will be informed based on this evaluation and contextual delays.
Historical Context
- Acknowledgment of previous challenges faced by the speaker when stepping into ongoing projects, highlighting the need for better insight into project statuses before significant progress is made.
IBM's Involvement
- Reflecting on IBM's involvement approximately 1.5 to 2 years ago, which was seen as a necessary step due to prior project stagnation. This decision was viewed positively despite prolonging timelines.
BOTA Modernization Initiative Update
Project Highlights
- Introduction by Kristen Wheeler regarding the BOTA Modernization Initiative aimed at replacing an outdated content management system through phased implementation.
System Selection and Cost Efficiency
- The chosen system was off-the-shelf with customizations, leading to cost savings compared to a full replacement of both content management and case management systems.
Progress and Challenges
- Completion of the content management portion has been achieved; however, customization efforts have caused delays due to internal process realignment needed for efficiency.
Workflow Development Status
User Testing Phase
- Two out of five major workflows are currently undergoing internal user testing, with three more nearing readiness for testing despite slight delays in overall progress.
Online Payment Integration
- An online payment option has been integrated into forms associated with these workflows, set to launch once testing is completed successfully.
Public Portal Development
Beta Access Rollout
- Limited beta access has been granted for a public portal related to the project; however, it is not yet ready for full public rollout due to account provisioning challenges.
KDHE Ryan White Program Database Update
Transition from Legacy Systems
- Jason Jones discusses moving away from an outdated claims processing system that had minimal upgrades since the 1990s due to persistent delays in claims processing.
RFP Process Initiation
- Following changes in reporting requirements, there’s a need for RFP generation for both eligibility application database and claims processing systems after initial sole source determinations were revoked.
Future Steps and Timelines
Contract Extensions
- Discussions are underway to extend contracts with legacy systems until December 31st, 2028, ensuring continued claims processing while new systems are developed.
Upcoming RFP Targets
- Target dates established include submitting an RFP for claims processing by March 31st, 2027.
Overview of Project Timelines and Funding
Project Duration and Claims Processing
- The project will not conclude until December 2028, when claims processing through the legacy system ceases.
- The first RFP is crucial as it influences the second RFP for claims processing, which depends on eligibility application validation.
Ryan White Program Insights
- Currently, there are 1,900 Kansans enrolled in Ryan White Part B and approximately 900 in Part A; over 4,000 people live with HIV in Kansas.
- The new system must accommodate fluctuating eligibility requirements annually for those receiving care under the Ryan White program.
- Annually, nearly $7 million is processed in claims related to outpatient care, premiums, and co-pays.
New Projects Initiation
Kansas Board of Healing Arts Evoque Project
- Jeff Cundiff introduces the transition from a legacy system to Evoque software due to end-of-life concerns by June 30th, 2027.
- Acela was rejected because it lacked necessary functionalities for licensing various professions requiring different CE credits.
Reporting and Execution Phase
- There was confusion regarding quarterly reporting; updates should appear in the next quarter's report since execution began recently.
KDOL Customer Intelligence and Insights Integrity Analytics Project
Unemployment Insurance System Enhancements
- Secretary Amber Schultz discusses ongoing adaptations to the unemployment insurance system initiated back in 2024 to combat evolving fraud tactics.
- The new module integrates directly with existing systems rather than functioning as an ancillary tool, enhancing detection capabilities throughout the claim cycle.
Continuous Improvement Approach
- Although deployed successfully, this module will undergo constant improvements rather than reaching a final completion point.
- Implementation costs were around $460,000; proactive measures aim to prevent fraudulent claims similar to past incidents where significant amounts were lost.
Overview of New Work Streams and Project Management
Introduction to New Modules
- The introduction of new modules creates additional work streams, allowing the system to identify these as new projects.
- Larger systems may see these modules added as amendments to existing contracts, reflecting a shift towards a risk-based model in project management.
Reporting Structure
- Projects are reported under "beginning execution" rather than "completed," indicating ongoing development phases.
- Successful partnerships with vendors are highlighted, emphasizing quick implementation of modules that meet expectations.
KHP CGIS Software Upgrade Project
Project Details
- Tom, the Chief Information Officer for Kansas Highway Patrol, discusses the SmartCOP software upgrade replacing outdated systems.
- The upgrade includes functionalities like online crash reporting and automatic vehicle location services for enhanced operational efficiency.
Challenges and Successes
- Although the project exceeded initial timelines by two years, it remained within budget due to effective vendor collaboration.
- Tom invites questions regarding the project's outcomes and future implications.
Enterprise Licensing Platform Project
Initial Implementation
- The first phase of the Enterprise Licensing Platform has been completed with three agencies onboarded successfully.
- Additional agencies are being integrated into the platform, showcasing its versatility across various licensing applications.
Future Prospects
- There is potential for 11 more agencies to join, each bringing their own funding for participation in this initiative.
OITS Content Management System RFP
Upcoming Initiatives
- An RFP is being prepared for an enterprise content management system aimed at refreshing existing platforms used since COVID began.
- The estimated cost for conversion and monetization on a new platform is approximately $2.1 million, including hosting fees.
Timeline Expectations
- Completion of this project is projected to take about one and a half years.
Executive Session Discussion
Security Matters
- A motion was made to recess into an executive meeting focused on security issues within the Department of Aging and Disability Services.
Recommendations from Committee Members
System Replacement Proposal
- A recommendation was made regarding the Department of Revenue's aging tax system (over 26 years old), suggesting discussions about potential replacements with new leadership.
Considerations on Custom Solutions
- It’s noted that while looking at other states' systems can provide insights, custom solutions may be necessary due to differing state statutes.
Independent IT Offices Recommendation
- A suggestion was put forth advocating for independent chief information offices within DCF and KDADS based on lessons learned from past integrations.
Discussion on Agency Structure and IT Issues
Historical Context of Agency Splits
- A representative seeks clarification about the agency structure, noting that an executive order in 2012 split certain agencies and renamed them.
- The speaker recalls that prior to the split, there was a single agency overseeing operations, which has since changed.
- It is mentioned that children were never part of the Department of Aging, indicating distinct systems for SRS and aging that could not share data.
Executive Reorganization Details
- Alex Gard, Principal IT Auditor, explains that in July 2012, SRS was renamed DCF and aging became KDADS as part of the reorganization.
- An MOU was signed between KDADS and DCF in August 2016 to pool staff resources to address IT staffing issues faced by both agencies.
Recommendations for Legislative Clarity
- A committee member expresses interest in understanding who created the current problems within the agency structure.
- Another member emphasizes the need for clarity regarding which committee should handle various IT issues due to overlapping responsibilities among committees like JCIT and commerce.
Need for Focused Legislative Committee
- James Curtis highlights struggles with infrequent meetings of JCIT amidst increasing complexity in IT matters requiring legislative attention.
- He suggests developing expertise within the legislature or creating a dedicated committee focused on IT issues for better management.
Consistent Meeting Recommendations
- A colleague agrees on the necessity for more frequent meetings of JCIT to effectively address ongoing challenges related to technology integration.
- The importance of having a corresponding standing committee in the Senate is noted as essential for scheduling discussions around modernization efforts.
Closing Remarks and Future Meetings
- Members express gratitude towards leadership roles within the committee while acknowledging past contributions from colleagues like Representative Turner.
- The chair mentions plans for future meetings before sessions begin, ensuring readiness to discuss project reports or urgent matters.