Overview of Pohang Steel Company

  • Established in 1954, Pohang Steel is Korea’s first private steel company, producing various steel products including H-beam section steel used in large structures and civil engineering.
  • It ranks as one of the three largest steel companies in Korea and was the 84th largest globally based on production in 2015.

Scrap Metal Collection

  • Trucks collect discarded scrap metal nationwide; dust covers are used on city roads but removed inside the factory.
  • Approximately 200 trucks deliver around 60,000 tons of scrap metal daily, valued at tens of billions of dollars.
  • A massive grapple operates like a claw machine to load different sizes of scrap into a bucket that can hold about 110 tons.

Melting Process

  • The electric furnace melts iron scrap at approximately 1600℃; workers wear flame-retardant gear due to extreme heat and flames.
  • High-voltage current is used to melt the scrap metal while impurities are filtered out with over a 90% recovery rate.

Refining Molten Steel

  • Clean molten iron is transferred to a ladle for further processing; it retains a temperature around 1600℃ during this stage.
  • Chemical reactions during subsidiary material input cause sparks; operators visually check the condition before moving to refining.

Casting and Rolling Processes

Casting Molten Iron

  • The refined molten steel undergoes two refining processes before being poured into molds through connected nozzles.
  • Semi-finished products emerge from molds with surface temperatures between 900~1000℃.

Shaping Section Steel

  • Gas cutters shape the hot section steel, which is not yet finalized; serial numbers are engraved for identification purposes.
  • The semi-finished products are reheated up to 1270Β°C for about two hours before rolling begins.

Finalizing H-Beam Shape

  • Softened section steel is pressed multiple times through rolling mills to achieve precise 'H' shapes across ten stands.
  • After rolling, water cooling lowers the temperature; coolant is reused after exposure outside.

Final Processing Steps

Cooling and Proofreading

  • The cooling process takes about 1 to 2 hours depending on product specifications; remaining coolant evaporates quickly upon contact with air.

Cutting and Binding

Turn any video into a summary like this

YouTube links, meetings, lectures. With transcripts, search, and chat.

Video description

πŸ‘€ Product in Video : http://bit.ly/3wHNSgp / https://www.steelshop.com __ πŸ“§ Contact : allprocessofworld@gmail.com 🎁 Join Channel Membership : https://bit.ly/3NBrf2Y πŸŽ₯ Copyright(C) 2020. #allprocessofworld #μ„Έμƒμ˜λͺ¨λ“ κ³Όμ •. all rights reserved.