Duarry Revision Balsa Duarry
Introduction to AUSMAR and Life Raft Inspections
Overview of Life Raft Importance
- Juan Fargas, General Director of AUSMAR, introduces the series focused on life raft inspections, emphasizing their critical role in emergencies.
- Inspections are not only regulatory requirements but also essential for ensuring that materials (rubber, plastics) inside the raft are in optimal condition for use during emergencies.
Inspection Process
- The life raft is removed from its vacuum-sealed container, which protects it from moisture and environmental damage over time.
- Safety measures are taken by disconnecting the firing head to prevent accidental deployment while preparing the raft for inspection.
Ensuring Flexibility and Integrity
Inflation and Pressure Checks
- The team inflates the life raft to restore flexibility after prolonged storage; this prevents material degradation when deployed.
- A pressure check is conducted on the CO2 bottle to ensure it contains the correct gas and maintains original pressure levels.
Safety Mechanisms
- Verification of the firing head's integrity ensures it has not been tampered with or accidentally activated.
- Overpressure valves are tested during inflation to confirm they function correctly, preventing potential floatation device explosions.
Emergency Equipment Review
Contents of the Life Raft
- The external light system is checked for functionality as part of safety equipment verification.
- All emergency supplies within the raft are reviewed: thermal blankets, signaling devices (smoke signals), fishing kits, repair kits, etc., ensuring they meet safety standards.
Compliance and Documentation
- Expiry dates on all emergency items are noted; compliance checks will be documented in a certification log once confirmed valid.
Final Checks Before Packing
Structural Integrity Assessment
- The team inspects all securing straps and access ramps for proper attachment and condition before repacking.
Preparation for Storage
- After confirming all systems function correctly (inflation tests, battery checks), air is released from the vacuum bag to prepare for compact storage.
- Electrical systems are connected so that lights activate automatically upon inflation of the raft.
Conclusion of Inspection Process
Compacting for Storage