C-DATA EPON 8 PORT OLT Configuration with VLAN || Bangla Tutorial
Introduction to C Data World
Logging In and Dashboard Navigation
- The presenter logs into the system using admin credentials, indicating successful access to the dashboard.
- The focus shifts to configuring ports, specifically wanting to set up an uplink on port G1 while noting that all other ports are currently down.
Port Configuration and VLAN Setup
- The presenter identifies that ports G1 through G4 are not tagging correctly; they will be changed from access mode to trunk mode for proper configuration.
- After applying trunk settings on ports G2, G3, and G4, the next step involves adding a VLAN configuration based on upstream requirements.
VLAN Tagging and Untagging
- The presenter configures VLAN 244 by tagging ports G1 through G4 while untagging ports 1 through 8 for plug-and-play functionality.
- Confirmation of successful addition of the VLAN is noted, followed by saving the configuration changes.
Inbound Management IP Configuration
- Moving to inbound management settings, an IP address from a private series (172.16.20.6 with a /30 subnet mask) is prepared for use.
- A gateway IP (172.16.24.85), previously used in MikroTik setups, is saved for external access via telnet.
Finalizing Ethernet Port Settings
- The presenter highlights the need to assign VLAN configurations to four Ethernet ports (G5-G8), ensuring users can connect directly without issues.
- A review of all configurations is conducted before finalizing changes; options for deleting or refreshing settings are also mentioned as part of good practice in network management.